A shower that stains, smells, or sheds grout in the same spot is not asking for a color change. It is telling you the waterproof layer under the tile stopped working, probably a while ago.
Call (682) 628-2026Upfront pricing · No obligation · Local Tarrant County technician
Six boxes, about thirty seconds. You pick when to be called back, and that is when the phone rings.
Or call (682) 628-2026Sort the symptoms into two piles. Cosmetic: dull grout, scratched acrylic, hard water film, a door binding on its track. Structural: grout that keeps opening at the same inside corner, tile that sounds hollow under a knuckle, a curb that has swollen, soft drywall on the far side of the wet wall, a musty smell that returns a day after cleaning, a stain on the ceiling below. The second pile means water is getting past the finish and living inside the assembly. Photographs help, but pressing the tile field with a flat hand and tapping across it tells you more, because backing that has lost its bond flexes and sounds different from backing that has not.
In the 1950 to 1969 stock that dominates the Central and East sectors, the original shower was usually a mortar bed over a sheet pan, with tile set into that mud. Those beds work for decades and then stop, because the pan corners are the weak point and the mortar holds water once the pan gives up. Later remodels layered on their own eras: paper-faced board with no waterproof coating, a fiberglass insert dropped onto the old bed, or mastic-set tile in a wet area where mastic never belonged. Two or three of those layers stacked in one wall is common, and each one changes how far demolition has to go before there is something to build on.
Grout is not a waterproof layer and was never meant to be one. Sealing a shower whose pan or backing has failed hides the evidence for a season while the framing keeps taking on water. The same goes for a new liner laid over a spent mortar bed. The tell that somebody is planning this is a scope that names caulk, grout and glass and never names the waterproofing membrane by product. Under the 2021 codes Arlington adopted in November 2022, the shower is an assembly rather than a surface. Ask which membrane, ask whether it is sheet or liquid applied, and ask to see the flood test before any tile reaches the wall.
A straight crack running across a tile floor, or a line of loose grout parallel to a wall, is usually the slab telling on itself. Clay under the house swells with spring rain and shrinks through a summer that averages 20.2 days at or above one hundred degrees at the DFW airport, and rigid tile bonded to a moving slab has to be given somewhere to go. The TCNA Handbook's EJ171 detail sets interior movement joints no more than twenty-five feet apart in each direction, and tightens that to eight to twelve feet where the installation sees moisture or direct sun. It also calls for a soft joint at the room perimeter that base or shoe molding normally hides. A shower floor is a wet interior.
A shower floor has to fall a quarter inch per foot toward the drain, and that pitch belongs in the substrate rather than faked with extra mortar under the tile. In an older bath the drain itself is often the interesting part: a cast iron shower drain with a lead bend, corroded at the connection, sitting in concrete. Replacing that assembly means opening the slab, which pulls the job into permitted plumbing work and onto the inspection calendar. It is a real cost, and it is also the one moment when the component most likely to leak for the next thirty years can be swapped for plastic while the floor is already open.
North Texas is not dry at the hours a shower runs. National Weather Service normals for the DFW airport put average relative humidity at 82 percent at 6 a.m. across the year, and 87 percent at 6 a.m. in May. That is the outside air a fan draws in while it pushes wet air out, which is why an undersized fan never clears a mirror. The residential code sets bathroom local exhaust at 50 cubic feet per minute intermittent or 20 continuous, and requires it to discharge outdoors rather than into an attic or a soffit. A duct that simply ends above the insulation is a common finding in this housing stock, and it is why a rebuilt shower grows a stained ceiling in year two. Fans themselves run about ten years.
A shower rebuild is a staged week or two rather than a day. Protection and demolition, an honest look at framing and the drain, any approved corrective work, rough plumbing, inspection, backing and membrane, flood test, sloped bed and tile, grout, glass measured after the tile is set, then fixtures and final sealing. Glass is a lead time rather than a task, because it is templated on finished walls. The range on this work is driven by whether the pan is rebuilt or replaced, whether the drain moves, tile size and pattern, and whether the glass is framed or frameless. A scope that cannot say which pan it is building has not looked yet.
Shower Remodel in Arlington. Call (682) 628-2026 and a technician is dispatched with the parts on the truck. You get the price before the work starts.
Call (682) 628-2026Arlington’s permitting guide lists electrical and plumbing among required permit categories, directs applicants to ArlingtonPermits.com to apply and schedule inspections, and says inspection requests made after 7 a.m. are scheduled for the following business day.
Why it matters: The wall-close and finish schedule has to leave room for the right checks. A remodel plan that separates demolition, rough plumbing and electrical work, inspection, waterproofing, tile, and fixtures avoids covering work before it can be checked and helps set a realistic finish date.
Source: arlingtontx.gov
Arlington Economic Development Corporation’s July 2024 single-family housing profile reports a 1984 median year built for a single-family property and says more than 65 percent of the city’s housing stock was built before 1990, using 2023 Tarrant Appraisal District data.
Why it matters: In an older bath, the visible tile is not the whole scope. The crew should allow for an early look at the drain, supply lines, venting, framing, and prior repairs once access is opened. That is the practical way to turn an older-room remodel into a defined plan rather than a string of surprises.
Source: arlingtontxedc.com
Arlington’s December 2024 DIY permit guide identifies kitchen and bath remodels among the common home changes that require a permit. The same guide recommends using a licensed professional contractor for electrical and plumbing work for safety reasons.
Why it matters: A bathroom scope should be settled before finishes are ordered: moving a drain, adding a circuit, changing framing, or altering the shower layout can change the permit path. A clear work list makes it possible to plan the right sequence instead of discovering a permit question after walls are open.
Source: arlingtontx.gov
Upfront pricing · No obligation · Local Tarrant County technician